1064-6671
工程技术
Quarterly
No
SPE DRILL COMPLETION
0
27
UNITED STATES
https://www.onepetro.org/journals/SPE%20Drilling%20-%20Completion/Preprint/Preprint
较慢,6-12周审稿时间
容易平均录用比例
1.2影响因子
工程:石油小学科
14/24JIF RANK
1351总被引频次
包括水平和定向钻井、钻井液、钻头技术、防砂、射孔、固井、井控、完井和钻井作业。《石油工程师学会钻井与完井》是石油工程师学会钻井工程的后续出版物。
https://mc.manuscriptcentral.com/spedc
Covers horizontal and directional drilling, drilling fluids, bit technology, sand control, perforating, cementing, well control, completions and drilling operations.SPE Drilling & Completion is the successor publication to SPE Drilling Engineering.